Blog
Cancel or Change a Lungarex Order: Who to Email
To cancel or change a Lungarex order, email [email protected] as soon as you can with your full name, email address, order ID and what you want changed. Orders are processed in 1 to 2 business days, so a change after the order ships may not be possible. We found no stated cancellation policy.
Written by the Lungarex label deskUpdated · 4 min read

Who to email01
One address for orders
The seller's brief lists one email for orders, tracking, order changes, refunds and product questions: [email protected]. No phone line, street address or hours are stated. The sales page says orders are processed in 1 to 2 business days (Lungarex sales page).
| Change | Say in the email |
|---|---|
| Cancel the order | Order ID, name, and that you want to cancel before shipping |
| Change the address | Order ID and the full new address |
| Change the pack | Order ID, the pack you have and the one you want |
| Fix a name or email typo | Order ID and the corrected details |
| Ask where it is | Order ID and order date; see the tracking post |
Speed02
Why speed matters
Once the order is processed and shipped, a parcel is in a carrier's hands. A change then may not be possible, and a cancellation may turn into a return. We found no source that sets a cancellation window, so assume the clock is short and write the same day.
- Write before you wait for a reply to anything else.
- Put the order ID in the subject line.
- Keep the confirmation email.
- Note the time you wrote, in case you follow up.
After shipping03
If it has already shipped
Once you have a tracking email, treat the order as shipped. You can still use the 60-day guarantee, which covers unopened, sealed bottles for 60 days from the order date. The original shipping is not refunded, and you pay return postage unless the item is damaged, defective or wrong. See how to get a refund.

Lungarex Capsules: from $49 a bottle30 capsules a bottle · 2, 3 or 6 bottles · free US shipping on 3 and 6 · 60-day money-back guarantee
See packsDecide with care04
A change of mind is fine
If you have second thoughts, ask a doctor or pharmacist before the parcel arrives. Keep taking prescribed medicine, including any inhaler. Lungarex is a dietary supplement, not a treatment for asthma, COPD or any lung condition, and it does not replace prescribed medicine. Call 911 for sudden or severe trouble breathing or chest pain.

3 bottles · 90 days · 3 bonus guides
3 bottles: 90 days
$207$69 a bottle · about $2.30 a day
Free US shipping · 60-day money back
Order 3 bottles
6 bottles · 180 days · seller's “Best Value” label
6 bottles: 180 days
$294$49 a bottle · about $1.63 a day
Free US shipping · 60-day money back
Order 6 bottlesPrices on the Lungarex sales page, November 30, 2026 (Lungarex sales page). Two bottles are also sold for $158, with shipping added at checkout. Check your medicines with your doctor or pharmacist before you order.
FAQ05
Lungarex questions people ask
How do I cancel a Lungarex order?
Email [email protected] with your order ID. Do it before the order ships.
Can I change the shipping address?
Ask by email at once. We found no stated rule.
Is there a phone number?
None is listed.
What if it already shipped?
Use the 60-day guarantee for sealed bottles.
Who wrote this06
Written and reviewed by
Pages built from the label, the sales page and linked NIH, FDA, CDC, FTC and peer-reviewed sources.
Last updated . Read our editorial standards and how we check reviews. This website is the information site of an authorized U.S. reseller of Lungarex. It is not the manufacturer. We earn money when you buy through our order links.
Sources and links (1)
- Lungarex official sales page (lungarex.com) Lungarex sales page linked in the seller's brief, 2026
Keep reading
More about Lungarex
Authorized U.S. reseller of Lungarex
Ready to try Lungarex?
Check your medicines first, including your inhaler, blood thinners and diabetes medicine, then pick a pack. Six bottles cost the least per bottle; three and six ship free in the US; every pack carries the 60-day money-back guarantee for unopened, sealed bottles.
- Secure checkout on the sales site
- 60-day money-back guarantee
- Ships from the U.S.


